VIM: How to set default color on search based syntax highlighting

Currently my /etc/vimrc file is set to the following: (

if &t_Co > 2 || has("gui_running") syntax on set hlsearch endif filetype plugin on if &term=="xterm" set t_Co=8 set t_Sb=^[[4%dm set t_Sf=^[[3%dm endif 

My problem is that whenever I am in VIM and search for a string when it finds it it highlights it in a bright yellow block. This not not a problem unless I try to find text that is white, then it makes it very difficult to see. I have tried changing the line:

set hlsearch="another_color" 

But I get an error when trying open back up the file after saving.

Error detected while processing /etc/vimrc: line 51: E474: Invalid argument: hlsearch=light 

In this block of code something tells me this controls background and foreground colors, but I am not sure if that pertains to the "hlsearch" option.

if &term=="xterm" set t_Co=8 set t_Sb=^[[5%dm set t_Sf=^[[6%dm endif 

I have tried changing the 5 and 6 to different numbers and that has no effect. I still have a yellow highlight box for searched text.

So my questions are:

1) Where is this "default" yellow color coming from?

2) How do I change it to something else?

2 Answers

All syntax colors, including the search highlight color, are set by changing a highlight group rather than an option. You set these groups with the :highlight command. For example I have changed search highlighting from yellow a bright turquoise:

:highlight Search guibg=Turquoise4 

I have also changed the IncSearch color, which is the color when 'incsearch' is set:

:highlight IncSearch gui=underline,bold guifg=White guibg=Red3 

See :help :highlight and :help highlight-groups.

Figured it out. In /etc/vimrc under the "syntax on" line add:

hi Search ctermbg=red hi Search ctermfg=white 

This example will give you a red block with white text while searching files with VIM. Inside VIM you can also do:

:highlight Search ctermfg=yellow 

To change it on the fly.

Your Answer

Sign up or log in

Sign up using Google Sign up using Facebook Sign up using Email and Password

Post as a guest

By clicking “Post Your Answer”, you agree to our terms of service, privacy policy and cookie policy

You Might Also Like